Robust design and patented soft-release system allow seamless deployment of reliable hydraulic downhole wet-mate connector
Download PDFMature Fields
Enable ESP replacement and preserve functionality of SmartWell® technology
Middle East
In April 2024, Halliburton successfully deployed the 50th Fuzion®-H hydraulic downhole wet-mate connector. This technology is foundational to facilitate completions using a combination of SmartWell® equipment technology and electric submersible pump (ESP) systems. The Fuzion-H connector offers a dependable solution to enable retrieval of the upper completion and ESP without having to remove the lower completion. This approach significantly reduces the time and costs associated with ESP replacement and maintains full SmartWell equipment capabilities for production optimization. Re-establishing connectivity to the lower completion is achieved through the deployment of a new upper completion and ESP equipped with a Fuzion-H stinger.
In multizonal wells equipped with ESPs, conventional completion systems commonly deliver commingled flow. This assigns equal production priority to all connected reservoir sections without the capability to control the amount each zone contributes or isolate watered-out zones. This conventional approach often leads to underperformance in wells, particularly a high water cut in one zone diminishes the production potential of other zones in the well.
SmartWell technology enables the operator to monitor and control various zones in real time to improve reservoir management, enhance productivity, and maximize hydrocarbon recovery.
The challenge lies in the integration of ESP systems with SmartWell technology while enabling economical ESP replacement. Establishment of a reliable and active connection between the upper and lower completions in a well with SmartWell® technology can be complex, particularly during ESP workover operations. This integration must address mechanical and operational intricacies to ensure effective and efficient management throughout the life of the well.
The Fuzion-H hydraulic downhole wet-mate connector integrates the following unique features to greatly enhance deployment flexibility and reliability.
operational goals met during every installation
successful Fuzion-H connector deployment in Middle East
All installations to date were successfully deployed, met operational objectives, and ensured uninterrupted functionality. The Fuzion-H hydraulic downhole wet-mate connector can provide the following notable enhancements to well operations:
The Fuzion®-H electro-hydraulic downhole wet-mate connector enables multi-trip hydraulically-controlled completions.
The Fuzion® suite of wet-mate connectors facilitates removal of the upper completion from the lower completion without using destructive intervention methods.