Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

420 Corsair motor improves drawdown in tight clearance wells

Halliburton's 420 Corsair EMS motor coupled with Tiger Shark® TS3 pumps provided the power needed to increase drawdown by 12% and total fluid production by 15%.

Case Study

Boots & Coots achieve execute well for blowout resolution

Discover how Halliburton's multidisciplinary response resolved a catastrophic blowout crisis in the first attempt in an Indonesian well with no incidents.

Case Study

New quantifiable operational rig audits lead to improvements

Boots & Coots well control audits help major operator improve safety and efficiency, reducing exposure to well control events and increasing audit scores 22%.

Case Study

Boots & Coots establish control of well after blowout during workover operation

Discover how Halliburton's Boots & Coots team contains well in emergency situation without incurring any injuries during an operation in South America.

Case Study

Operator attains longer, consistent runs with HyperSteer Bit

HyperSteer™ directional drill bit sets a new spud record of 18.06 days in the Permian Basin, beating the previous operator record by more than five days.

Case Study

RockStrong Coring System operation: carbon capture & storage

Halliburton developed an integrated solution within multiple product service lines that implemented lessons learned and knowledge gained from previous projects with the operator.

Case Study

Intelevate Platform Boosts Uptime & Reduces Service Visits

The Intelevate platform was deployed to provide cloud-based, remote well-monitoring and optimization solutions, eliminating in-person wellsite visits.

Data Sheet

VersaFlex DTPBA-RL Dual Trip PBA

The VersaFlex® DTBA-RL allows an extended upper PBR to be installed with a drill pipe landing string with the tie-back seal assembly run in later.

Case Study

40K USD saved from developed core head design

Cut and recovered 180 ft. of 4 in. core in three concurrent 60 ft runs using a single core head in challenging Thebes formation, reducing costs and downtime.

Case Study

Curve/lateral drilled with a BHA and a HyperSteer Drill Bit

An operator located in the Midland Basin in Texas doubles percentage of one-run curve/lateral section with less vibration compared to competitor drill bits.

Results per page: 102550