Case Study
Over $3MM savings achieved using Hydra-Blast® pro service
Disocver how Hydra-Blast pro service was used for the plugging of a 13,000 ft well due to the accumulation of water production and acid insoluable scale.
Discover the most up-to-date case studies, brochures, data sheets, and other resources from Halliburton