Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

Lead Independent Director Charter

The Lead Independent Director at Halliburton coordinates activities among non-management Directors and ensures timely information flow to the Board.

Case Study

Acoustic evaluation of cement integrity saves rig time costs

The Halliburton CAST-M™/RBT-M tool combination enabled a faster and more-confident cement evaluation to save an operator in Egypt $100,000 in rig time costs.

Case Study

Tailored cement spacer system improves barrier dependability

The first application of Tuned® Defense™ Cement Spacer in this field achieves top of cement and enhanced cement logging results for a Colombian operator.

Case Study

Operator controls major loss event in Gulf of Mexico

Halliburton's BaraBlend®-680 lost circulation material helped salvage the well, reduce losses, and move to the production zone while saving over USD $1M.

Case Study

Engineered solution enables operator to drill reentry well

For a customer in the Gulf of Mexico, Halliburton provided an integrated drilling service that achieved drilling program goals without non-productive time

Case Study

RezConnect™ testing system – full acoustic control of DST

RezConnect™ Well Testing System successfully communicated at 100% throughout the well test, demonstrating the reliability of downhole wireless technology.

Case Study

Pig locating and tracking with InnerVue™ technology

Halliburton's InterView™ technology helps remove the challenges of pigging with fast, accurate locating of lost objects with non-intrusive technology.

Case Study

PinPoint re-stimulation using SurgiFrac® stimulation method

SurgiFrac® was selected as the stimulation method to enable targeted placement of treatments, utilizing dynamic diversion to provide pressure isolation.

Case Study

Integrated well intervention solution lowers time during P&A

Drill Tech deburr mill and RTTS packer enable wellbore cleanout and communcation test in single trip.

Case Study

Intelligent completions improve recovery in subsea field

Discover how Halliburton's advanced completion solution enables wells to remain fully functional after five years of production in offshore Indonesia.

Results per page: 102550