Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

High-performance non-aqueous fluid system saves 55 hours

BaraXcel™ helps Middle East operator drill high over balance interval without incident. 120,000 USD savings achieved by avoiding a conditioning trip.

Case Study

XtremeGrip® ELH system helps operator overcome wellbore challenges

Installing a 9 5/8-in. × 13 3/8-in. XtremeGrip® expandable liner hanger (ELH) system helped a major offshore operator in Australia face an extended-reach drilling (ERD) challenge in a subsea gas well development.

Data Sheet

Trifex™ shaped cutter - data sheet

Trifex™ shaped cutters offer unique geometry for increased drilling efficiency

Case Study

Corrosion-resistant solution enables class VI CCUS well permit - Case study

ThermaLock™ II cement system successfully placed during multiple-stage cement operation for carbon sequestration.

Case Study

Success from CorrosaCem multistage cement solution

CorrosaCem cement system placed in three-stage production casing using Fidelis stage cementers, +80% displacement efficiency at each depth of interest.

Case Study

African wellbore efficency improved through cleanup solutions

Halliburton provides solvency to deepwater wellbore cleanout solutions in Africa, resulting in 57 Wells completed to date and 181 Successful tool runs to date.

Case Study

Corrosion-resistant solution allows Class VI CCUS well

Carbon capture, utilization, and storage (CCUS) is a rapidly growing market within oil and gas industry because of increased focus on emissions targets.

Case Study

Corrosion-resistant cement for CCUS well construction

Discover how Halliburton's ThermaLock™ cement and Fidelis™ stage cementer achieve zonal isolation in low-fracture-gradient injection zone of CCUS well.

Case Study

Operator drills record lateral using trackable fluid system

Discover how Halliburton's water-based system with trackable shale inhibitor and fluid loss control agent helps mitigate fluid loss in a HTHP environment.

Case Study

High-performance non-aqueous fluid system helps operator save 55 hours of rig time

Operator drills high over balance interval without incident and cancels 55-hour conditioning due to fluid stability and good hole conditions after 128 hours of logging in 315°F reservoir

Results per page: 102550