Operator Achieves High ROP in Horizontal Section, Drills One-Run Lateral
Operator Drills Record-Setting Lateral in Marcellus Shale
Halliburton provided reliable data from gas-cut cement when no one else could
Sistemas RapidStage® - Data Sheet
Case Study
Swellpacker systems help save 3M USD by reducing rig time
Learn how an operator located offshore of Latin America was trying to complete highly depressurized zones in its deepwater wells and needed Halliburton's help.
Case Study
Customized fluid system and Pulsonix removes wellbore damage
Two wells treated with a customized fluid system and Pulsonix TFA technology resulted in significant improvement to contributing length of production interval.
Veto™ 6 Subsea Test Tree - Data Sheet
Successful Installation of VersaFlex® Big Bore System in Egypt Extends Deepwater Envelope