Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

Seeing Clearly Through the Mistie

Discover how DecisionSpace® 365's new ‘Mistie Gridding and Residual Fit’ feature streamlines and enhances the generation of correction and difference outputs

View

Brochure

Contract and wholesale manufacturing / MENA - Brochure

Improve security of supply with concept to full-scale commercial production in the Middle East and North America.

Article

Introducing Cloud-Based Pre-stack Seismic Processing

This cloud-based SeisSpace® processing technology offers a comprehensive set of time and depth processing tools that can be used to process data from field QC (Quality Control) to advanced 4D, multi-component or Migration Velocity Analysis workflows used to feed time and depth migrations.

View

Brochure

Contract and wholesale manufacturing / North America - Brochure

Improve security of supply with concept to full-scale commercial production in the Middle East and North America.

Case Study

Global milestone achieved- 1,000 eRED® valve installations

Since the first eRED® electronic remote equalizing device deployed in 2008, the proven reliable eRED valve has achieved 1,000 installations globally.

Case Study

Longest and fastest salt section in deepwater field

Gulf of Mexico operator drills longest and fastest 16-1/2” x 19” salt section in deepwater field. Record footage with 9-1/2" iCruise and hole enlargement.

Case Study

Hydro-Helical® helps eliminate emulsion increases production

Hydro-Helical gas separator boosts production from 30 to 150+ BOPD, revitalizing Permian asset and saving up to USD 500K in unnecessary operational costs.

Case Study

Offshore oil and gas found with At-Bit LWD in Nigeria

At-bit resistivity measurements enable client to access hydrocarbon by drilling only a few meters without the risk of entering the over-pressured zone.

Case Study

Hydro-Helical® slugger HT overcomes gas slugging, enhances production

Water vapor increased 12% on steam assisted gravity drainage well (SAGD) well, resulting in stable production with longer run times

Case Study

Hydro-Helical® gas separator increases pump run life

Operator saw an opportunity to improve ESP run time with Hydro-Helical gas separator, due to cooler motor operational temperatures, and to maximize asset value.

Results per page: 102550