Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Crush & Shear hybrid bit tech improves drilling efficiency

Discover how Crush & Shear hybrid bit improves directional stability without sacrificing penetration rate, reducing the interval cost and saving over USD 120K.

Case Study

AcroClear® prevents scale formation in saltwater system

Acrolein program effectively removed and prevented scale in saltwater systems, significantly cutting treatment and maintenance costs for a West Texas operator.

Case Study

AcroClear® batch treatment saves time and money

Halliburton’s speciality chemicals solution, AcroClear® batch treatment, resolves an operator in the Permian Basin corrosion and solids buildup issues.

Data Sheet

DrillFact® connection time monitoring service - Data sheet

Drilling monitoring service that automatically measures and records connection time to enable efficient drilling to reduce well time

Data Sheet

EquiFlow® Inflow Control Device with Sliding Sleeve

Halliburton EquiFlow® inflow control device (ICD) with sliding sleeve, combined with PetroGuard® sand screen, provide inflow control technology with a mechanical sliding sleeve functionality.

Case Study

Hercules™ HPS enables $400K in added profit - Case study

Early readiness jumpstarts salt water disposal unit, avoiding $470K of deferred revenue and delivering an incremental $235K in profit in six weeks

Data Sheet

BaraMag® ditch magnets - Data sheet

The Halliburton BaraMag Zip-Klean ditch magnets are designed for the particular application to maximize fluid coverage

Brochure

Long-Term Crude Storage

Multi-Chem offers solutions for long-term crude storage challenges, including stabilization, microbial growth, and corrosion prevention.

Data Sheet

Well preservation for extended shut-in periods

Mitigate corrosion, bacteria growth, and scale deposition during extended well shut-ins with Multi-Chem's specialty chemicals.

Case Study

Brazilian operator improves rig time with well suspension intercept® RBP

Discover how first temporary well suspension with Halliburton's 10 ¾-in. Intercept retrievable bridge plug saves non-productive rig time for deepwater operator.

Results per page: 102550