Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Book

2018 HALPAC Annual Report

HALPAC contributes to candidates for election who understand the issues important to our company and industry.

Case Study

Advanced completion solutions for multizone water injection in soft sand - Case study

Halliburton installed a SHS for automatic ICV closure. This completion solution is the world’s first triple-zone, 10,000-psi water-injection completion

Data Sheet

Pulsonix® TFA Service - Data Sheet

Pulsonix TFA service enhances wellbore treatment effectiveness using innovative fluidic oscillator technology

White Paper

Fracture conductivity and cleanup in GOHFER® software - White paper

The following paper outlines the current process of generating useful fracture conductivity and effective length.

Data Sheet

EquiFlow® adjustable nozzle inflow control device - Data sheet

The Halliburton EquiFlow® adjustable nozzle inflow control device (ICD) combines the benefits of inflow balancing with the flexibility to reconfigure

Data Sheet

FiberVSP™ service - Data sheet

Our FiberVSP service is a distributed acoustic sensing (DAS) technology for Vertical Seismic Profile (VSP) data acquisition

Case Study

Real time data works with geosteering enhancements

Operator works to increase real-time data density and enhances geosteering using automated directional gamma service to counter changes in well construction.

Case Study

Operator takes a step towards drilling performance objective

Halliburton achieves record day footage with the Geo-Pilot RSS in a 16-inch hole, significantly reducing lost time and maximizing drilling efficiency.

Case Study

Operator puts well into production one day ahead of plan

Discover how a colombian operator outpaces drilling schedule, putting the well into production a day ahead with the help of Halliburton's Geo-Pilot® Duro RSS.

Case Study

Pipe partition system success reduces well time

Discover how an operator reduces well time with Halliburton Sperry Drilling's successful conductor pipe partition system exit located in offshore Indonesia.

Results per page: 102550