Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

eMotion®-HS remotely operated circulating valve - Data sheet

The eMotion®-HS valve is a computer-controlled, gas-tight (V0 rated) circulating valve that can be repeatedly opened or closed by remote command

Case Study

Dash® large bore subsea safety system streamlines operations

Electrohydraulic system offers rapid deployment, simplified operations, and streamlines a safe well abandonment solution in two wells in the Gulf of Mexico.

Data Sheet

DeepSqueeze™ system - Data sheet

Perforate and squeeze to remediate cement anomalies in high-pressure environments with Halliburton's DeepSqueeze™ system

Case Study

12 Swellpacker systems run successfully in horizontal well

Operator teamed with Halliburton to run multiple oversized Swellpacker systems that would expand and seal in the wellbore after being exposed to oil-based mud.

Case Study

RSS solution delivers success slim hole drilling in Norway

Drilling challenege equipped with Geo-Pilot® RSS in one run in Norwegian continental shelf and land by working with surface data logging in a 5,500 ft space.

Case Study

INNOVERT® Solution Enables Operator to Complete Long Lateral Section in Combo Well

INNOVERT® fluid solution saved $12.5 million by enabling a cost-effective well extension project in the UAE

Case Study

SPECTRUM® provides cluster analysis during millout

Discover how SPECTRUM provided innovative techniques enabling operator in North Dakota to both mill out plugs and analyze cluster efficiency in a single trip.

Book

2016 Sustainability Report

In 2016, we have executed in a challenging market through a strategy focused on managing costs and aligning our resources to strengthen our position.

Case Study

Achieving reservoir insight using new gamma service

The Radian azimuthal gamma ray service enabled an operator to better understand the stratigraphy of the reservoir to achieve accurate wellbore placement.

Case Study

Mirage® Plug Turns 3 Hours of Rig Time into 20 Minutes

Major operator in Malaysia challenges Halliburton to generate a single horizontal openhole completion for 18 wells as well as including fluid loss control.

Results per page: 102550