Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Boots & Coots Regains Control of Well After Blowout Occurs During Workover Operation

Gulf of Mexico: Single-Trip Solution Saves Operator $1.8 Million

Chemical Enhanced Oil Recovery (cEOR) Pilot Design

Installation of Buoyancy Modules at 3000 ft Water Depth from a Vessel with Coiled Tubing Downlines

First Combined EarthStar® and ADR™ Services Geosteer in Thin Oil Sand

ExpressKinect™ Manifold - Data Sheet

GeoForce® Motor Saves Operator 7.5 Drilling Days with Fewest Number of Bit Runs in History of Field

EquiSeal™ Conformance Service – Case History

Halliburton Wireline Solution Saves Client 80 Hours in Rig Time

Operator Successfully Runs 5 ¾-inch Slim-Hole Drilling Operation with Geo-Pilot® RSS System

Results per page: 102550