Customized Kill Mud Enables Operator to Abandon Well Ahead of Time, Saving USD 1 Million
ExpressSand Delivery System - Data Sheet
Case Study
ZoneGuard® HE Packer helps reduce NPT for operator
Successful installation in difficult application performed without non-productive time (NPT) saves customer up to seven days compared to a competitor's packer.
Case Study
PropStop gas service completes wellbore
Discover how Halliburton's PropStop® Service was bullheaded into the wellbore (80% foam quality) and displaced with nitrogen in the Permian Basin, USA.
Case Study
New technology enables operator to achieve higher efficiency
Norweigian operator successfully builds completion of wellbore cleanout using Turbo Tech II valve and Inflow Tech packer with Setting Control Module.
Case Study
Slimline pump for irrigation well successfully deployed
Halliburton's Submersible pump for irrigation well enabled the customer to successfully produce the irrigation well and get much-needed water for its crops.
Case Study
One-run mill-out sets record for operations in Colombia
Halliburton leverages SPECTRUM Sensor Technology to enable the operator to have visibility over downhole parameters and also ensured control of milling.
Case Study
First fluid sampling-while-driving operation deployed in harsh environment
GeoTap IDS fluid identification and sampling service deployed in deep water well, completing first fluid sampling-while-drilling operation for the operator.
Case Study
Surveillance solution provides reliable real-time data
Discover how Halliburton's surveillance solution increases hydrocarbon recovery in high-temperature conditions for a customer located in North America.
Case Study
2M USD and 48 hours saved from RSS and At-Bit Reamer
Discover how Halliburton's engineered drilling solution, Geo-Pilot® Dirigo™ RSS with TD Ream® Tool, eliminates extra rathole run in the Gulf of Mexico.