Case Study
Operator achieves 90% intake pressure drawdown of GOR well
Discover how Halliburton's proposed design of ESP system draws fluid levels down from over 5,000 PSIA to under 500 PSIA, a 90% intake pressure drawdown.
Discover the most up-to-date case studies, brochures, data sheets, and other resources from Halliburton